Another Magnetometer survey?

June 4, 2003

We are going to do another magnetometer scan of the river this Friday.  Karl Butler (UNB) offered a couple of his students to help  scan the third span of the bridge.  Last time (April 6, 2003) we had scanned the second one (wrong one) and what we detected then was a rail.  This time we will scan the entire width of the river by means of my canoe and a magnetometer which will be tied in to a precision GPS receiver. 

Please reload

Featured Posts

Manchester Locomotive Works

March 4, 2016

1/10
Please reload

Recent Posts

July 8, 2020

June 25, 2020

January 2, 2018

March 3, 2016

March 2, 2016

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

© 2020 by Eric Ouellette. Proudly created with Wix.com

  • Facebook App Icon